Skip to main

Building the Future at Harrogate College

Get ready for a new Harrogate College campus. A modern space where students can learn more, achieve more and prepare for the future.

Harrogate College CGI image representation of the new building and entrance

We’re excited to unveil our new facilities and to support the next generation by providing life-changing opportunities in cutting-edge learning environments. Students can look forward to developing their skills in our:

  • Clean energy centre
  • Replica hospital ward
  • Digital technology suite
  • Fully-equipped electric vehicle workshop
  • Creative media lab
  • Business centre
  • Construction centre focused on low-carbon building methods

These state-of-the-art spaces will elevate our training provision across the board, so that every Harrogate College student will be able to gain the necessary knowledge and industry experience to pursue their goals beyond college. 

With £20 million in funding from the Department for Education, the redevelopment will replace our college’s main building and introduce energy-efficient systems, sustainable design and a dedicated renewable energy hub. Our ambition is to become a centre of green excellence, and reach our pledge of net zero by 2035. 

Building work is due to finish in December 2026, ready to welcome students in January 2027. The college will remain fully open throughout construction, with students continuing to access existing facilities.

Take A Look Inside

CGI image of the new Harrogate College renewable energy technology centre

Clean Energy Centre

CGI image of the new beauty studio coming at Harrogate College

Beauty Studio

CGI image of a classroom in the new building at Harrogate College

Classrooms

CGI image of the reception area in the new Harrogate College building

Reception

CGI image of a corridor in the new Harrogate College building

Corridors

Images included are CGI generated representations

Construction Progress

Video Transcript

Print Download Fullscreen

Location: Harrogate College, Hornbeam Park Avenue

Project Partner: Caddick Construction

Timeline: March 2026

This video contains an upbeat, rhythmic electronic instrumental track throughout. There is no spoken dialogue or voiceover. The visual progression is presented via an advanced drone fly-through and aerial survey documenting the campus construction progress.

The video begins with a fast-paced first-person view (FPV) drone sweeping low over the flat gravel roof of an existing building. As it clears the ledge, a wide construction site unfolds. Graphic overlay appears: “Caddick. Harrogate College – March 2026.”

The drone dives gracefully between a brick campus building and a massive, newly erected multi-story steel structural framework. At ground level, a white concrete pump truck is positioned with its massive mechanical boom arm extended upward toward the upper decks.

A sudden transition to a high-altitude, static aerial drone shot capturing the expansive layout of Harrogate College. The surrounding context reveals green fields to the left, parking lots, and the broader Hornbeam Park area.

A mid-range aerial shot tracks over a separate, long, single-story workshop building under construction. Workers in safety gear can be seen moving along its newly laid corrugated metal roof.

The camera cuts closer to the main multi-story steel frame. Several construction workers wearing high-visibility jackets and hard hats move methodically along the scaffolded levels next to bright yellow safety netting.

An elevated view from directly above the multi-story frame highlights the precise metal decking and a ladder access hatch leading to the top levels.

A sweeping panoramic aerial shot pans right to left across the campus, illustrating how the new steel structures integrate beside the original multi-story brick educational facilities.

The drone flies low at ground level, moving quickly along a dirt access path flanked by the steel framework on the left and an existing campus facility on the right.

A high-angle tracking shot glides over the roof profiles of the active construction zones, showcasing the immense scale of the campus upgrade.

Moving indoors, the FPV drone enters the interior of the multi-story steel frame. It flies smoothly through the open-air floors, revealing concrete foundations, overhead steel girders, and perimeter safety barriers.

A hyper-lapse style zoom quickly propels the camera forward through another interior floor level, emphasizing the clean engineering lines of the structure.

The drone swoops upward, climbing an external metal construction staircase attached to the scaffolding on the side of the building.

The camera glides onto an upper floor deck where a team of contractors in bright orange high-visibility clothing is actively pouring and smoothing wet concrete over a steel reinforcing mesh.

A smooth tracking shot passes directly next to the workers handling the heavy concrete pump hose, moving outwards past the edge of the building to reveal the campus exterior.

A wide aerial view from a distance looks down over the muddy construction zone, which features an active green drainage/settlement pond at the forefront of the site.

A tighter horizontal pan highlights a team of site managers and workers inspecting the upper levels behind a protective yellow safety rail system labeled “J-SAFE”.

The drone navigates an internal walk-through on a lower deck where the floor is covered in heavy-duty black damp-proof membrane sheeting. Workers in safety gear pass by structural concrete columns.

A low-altitude exterior shot glides past a large yellow Volvo tracked excavator parked on the muddy terrain right outside the structural skeleton.

The drone transitions seamlessly into the open interior of the single-story workshop building, showing the bare ground, internal steel framing, and a parked mini-dumper truck.

A broad aerial view looking down at the long workshop building shows contractors installing perimeter systems, with the original campus triangle-peaked roof visible in the distance.

The drone sweeps rapidly over the bright silver corrugated roofs of the new builds, banking sharply to give a dynamic sense of motion over the site.

A close-up aerial shot focuses back on the multi-story structure where the concrete mixer and pump continue to operate in tandem.

A high-angle vertical perspective looking straight down emphasizes the alignment of the new multi-story build against the surrounding parking infrastructure.

The video finishes with a series of grand, sweeping drone vistas displaying the entirely transformed Harrogate College footprint under a clear blue sky, before slowly fading out to a black screen.

Construction Timeline

Start

September 2025

Workshop Complete

October 2026

Teaching Block Complete

November 2026

All building work complete.

Time to begin the move

December 2026

Teaching and learning begins in the new buildings

January 2027

Demolition of the

old building begins

January 2027

All building and demolition

work completed

June 2027

Construction Timeline

Start

September 2025

Workshop Complete

October 2026

Teaching Block Complete

November 2026

All building work complete.

Time to begin the move

December 2026

Teaching and learning

begins in the new buildings

January 2027

Demolition of the old building begins

January 2027

All building and demolition

work completed

June 2027

The History of Harrogate College

1897

Harrogate College School of Art and Technology building in 1897 - black and white

A School of Art and Technology was erected as part of the Queen’s Jubilee celebrations. Costing £500 the foundation stone was laid at Haywra Crescent by H E Butler of Nidd Hall.

1903

Black and white image of a vintage leather satchel on old school desk

Harrogate Technical College opened its doors to both girls and boys to “prepare youths for industrial, commercial and professional pursuits”.

1955

1983 Victoria Avenue sign

It officially became known as the Harrogate College of Further Education after also occupying Belvedere House on Victoria Avenue. This is where the Harrogate School of Arts was based.

1985

Hornbeam Park train station sign

The Victoria Avenue and Haywra Crescent buildings closed and the whole college provision moved to Hornbeam Park Avenue, originally consisting of four buildings. The name changed to Harrogate College of Arts and Technology.

1994

Two desktop computers and hard drives from the 90s

The name of the college changed to Harrogate College.

2015

Harrogate College Bistro on the park wall sign

‘Bistro in the Park’ opened, along with the ‘Image Academy’

2026

Harrogate College CGI image representation of the new building and entrance

Harrogate College is undergoing a £22m+ campus transformation at Hornbeam Park, set to open for the 2026/27 academic year.

Frequently Asked Questions

Where will students be taught at the start of the academic year?

Teaching and learning will begin in September at our current college buildings. Students will move into the new campus buildings in January 2027, after the Christmas break.

Will students get to see the new building before moving in?

Yes. In December 2026, students will have the opportunity to walk around the new building ahead of the move. This will help them feel confident and familiar with the new environment before lessons begin there in January.

Will any facilities be affected while students are in the current buildings?

No. Our current buildings will remain fully functional until December 2026, with all facilities and student services operating as normal. There will be no reduction in teaching quality, resources or student support during this period.

Will students’ timetables change when they move to the new building?

No. The timetable students receive in September will stay the same for the whole academic year. There will be no changes to days, lesson times or teachers as a result of the move.

How will students be supported when they move into the new building?

In January 2027, all students will take part in a formal induction to the new building. This will ensure they are fully oriented, know where to go and feel comfortable using the new facilities from day one.

What happens to the current college buildings after the move?

From January 2027, the current main college building will begin to be demolished. Careful planning will be in place to limit disruption during this period, and ensure a safe environment for students and staff.

Will there be changes to parking on campus?

Yes, but for the better. Once demolition is complete, the site of the current main building will become the new college car park, which is planned to open in summer 2027.

Will the Christmas break be different during the transition year?

Yes. To support a smooth move, there will be a three-week Christmas break in December 2026. This allows:

  • Students a clear break
  • Our staff a dedicated week to move equipment and set up classrooms so that teaching can start smoothly in the new building in January 2027.
Will this transition affect students’ learning or experience?

No. The transition has been carefully planned to ensure:

– Continuity of teaching
– No disruption to timetables
– A smooth, well-supported move into a brand-new, modern learning environment
– Students will benefit from continuity at the start of the year and a fresh start in a state-of-the-art building after Christmas.

How will students/parents be kept informed throughout?

We’ll provide regular updates through college communications such as our student and parents newsletters, including key dates, reminders, and what to expect at each stage.

Is the current car park closed?

Due to construction work our car park is unavailable, except for blue badge holders.

There are designated on-street parking spaces away from the college, for example on Stray Rein or at West Park multi-storey car park which is a short walk from the college. Hornbeam Business Park’s spaces cannot be used.

Related News stories

Harrogate College students being given a tour of our under-construction new campus by developers Caddick Construction

Training the tradespeople of tomorrow

Read more

A group of Rossett School students visiting Harrogate College's under-construction new campus

School visit to our new campus shines a light on the construction industry

Read more

Staff and students wearing helmets and high vis smiling at the steel signing ceremony

Harrogate College celebrates milestone as new campus takes shape

Read more