Skip to main

Building the Future at Harrogate College

Get ready for a new Harrogate College campus. A modern space where students can learn more, achieve more and prepare for the future.

Harrogate College CGI image representation of the new building and entrance

We’re excited to unveil our new facilities and to support the next generation by providing life-changing opportunities in cutting-edge learning environments. Students can look forward to developing their skills in our:

  • Clean energy centre
  • Replica hospital ward
  • Digital technology suite
  • Fully-equipped electric vehicle workshop
  • Creative media lab
  • Business centre
  • Construction centre focused on low-carbon building methods

These state-of-the-art spaces will elevate our training provision across the board, so that every Harrogate College student will be able to gain the necessary knowledge and industry experience to pursue their goals beyond college. 

With £20 million in funding from the Department for Education, the redevelopment will replace our college’s main building and introduce energy-efficient systems, sustainable design and a dedicated renewable energy hub. Our ambition is to become a centre of green excellence, and reach our pledge of net zero by 2035. 

Building work is due to finish in December 2026, ready to welcome students in January 2027. The college will remain fully open throughout construction, with students continuing to access existing facilities.

Take A Look Inside

CGI image of the new Harrogate College renewable energy technology centre

Clean Energy Centre

CGI image of the new beauty studio coming at Harrogate College

Beauty Studio

CGI image of a classroom in the new building at Harrogate College

Classrooms

CGI image of the reception area in the new Harrogate College building

Reception

CGI image of a corridor in the new Harrogate College building

Corridors

Images included are CGI generated representations

Construction Progress

Video Transcript

Print Download Fullscreen

Location: Harrogate College, Hornbeam Park Avenue

Project Partner: Caddick Construction

This video contains an upbeat, rhythmic electronic instrumental track throughout. There is no spoken dialogue or voiceover. The visual progression is presented via an advanced drone fly-through and aerial survey documenting the campus construction progress.

Text on a black screen reads “Caddick.”

High aerial view over the Harrogate College campus, showing surrounding green fields, residential areas, and campus buildings under clear blue skies.

The camera slowly orbits above a multi-story brick building surrounded by scaffolding and protective netting, alongside newly constructed gray metal workshop buildings.

A lower aerial shot glides along the exterior pathway between the main scaffolding-enclosed building and the existing brick facilities, with construction materials neatly stacked on the ground.

Moving indoors, a smooth first-person walkthrough enters through an open ground-floor doorway into a raw, framed structure with exposed steel beams and concrete flooring.

The camera moves down a long interior corridor lined with freshly plastered and drywalled partition walls, wiring channels exposed along the ceiling structure.

Transitioning to a concrete stairwell framed with metal stud work, scaffolding railings, and temporary construction lighting.

The walkthrough continues along a brighter upper-floor hallway featuring installed interior doors, white-painted drywall, and exposed ceiling ductwork and green wiring cables overhead.

Entering a spacious corner classroom with large exterior windows. A worker wearing a high-visibility vest stands near a scaffolding ladder working on the window surrounds.

Moving out onto an upper-level rooftop area, showing stockpiled insulation material, roofing membranes, and HVAC units under installation.

An exterior aerial view sweeps around the multi-tiered scaffolding structure wrapping the entire building facade.

The camera descends toward the newly erected gray corrugated metal workshop building, showing freshly paved asphalt driveways and access lanes.

Moving through a large open vehicle bay entrance into a high-ceilinged workshop space with skylights, stacked building supplies, and a construction worker operating equipment.

Proceeding through an interior doorway into an adjoining workshop bay housing red scissor lifts, material pallets, and exposed concrete block walls.

Fast-paced walkthrough through finished hallways and dynamic camera sweeps across large, bright future classrooms filled with ventilation ducting and stacked materials.

A plasterer in a yellow hi-vis vest and hard hat applies smooth brown plaster to an interior room wall.

The view pulls back to a wide, sweeping aerial shot of the entire Harrogate College development project and countryside landscape.

The screen fades to black with the white “Caddick.” logo appearing centered on screen.

Construction Timeline

Start

September 2025

Workshop Complete

October 2026

Teaching Block Complete

November 2026

All building work complete.

Time to begin the move

December 2026

Teaching and learning begins in the new buildings

January 2027

Demolition of the

old building begins

January 2027

All building and demolition

work completed

June 2027

Construction Timeline

Start

September 2025

Workshop Complete

October 2026

Teaching Block Complete

November 2026

All building work complete.

Time to begin the move

December 2026

Teaching and learning

begins in the new buildings

January 2027

Demolition of the old building begins

January 2027

All building and demolition

work completed

June 2027

The History of Harrogate College

1897

Harrogate College School of Art and Technology building in 1897 - black and white

A School of Art and Technology was erected as part of the Queen’s Jubilee celebrations. Costing £500 the foundation stone was laid at Haywra Crescent by H E Butler of Nidd Hall.

1903

Black and white image of a vintage leather satchel on old school desk

Harrogate Technical College opened its doors to both girls and boys to “prepare youths for industrial, commercial and professional pursuits”.

1955

1983 Victoria Avenue sign

It officially became known as the Harrogate College of Further Education after also occupying Belvedere House on Victoria Avenue. This is where the Harrogate School of Arts was based.

1985

Hornbeam Park train station sign

The Victoria Avenue and Haywra Crescent buildings closed and the whole college provision moved to Hornbeam Park Avenue, originally consisting of four buildings. The name changed to Harrogate College of Arts and Technology.

1994

Two desktop computers and hard drives from the 90s

The name of the college changed to Harrogate College.

2015

Harrogate College Bistro on the park wall sign

‘Bistro in the Park’ opened, along with the ‘Image Academy’

2026

Harrogate College CGI image representation of the new building and entrance

Harrogate College is undergoing a £22m+ campus transformation at Hornbeam Park, set to open for the 2026/27 academic year.

Frequently Asked Questions

Where will students be taught at the start of the academic year?

Teaching and learning will begin in September at our current college buildings. Students will move into the new campus buildings in January 2027, after the Christmas break.

Will students get to see the new building before moving in?

Yes. In December 2026, students will have the opportunity to walk around the new building ahead of the move. This will help them feel confident and familiar with the new environment before lessons begin there in January.

Will any facilities be affected while students are in the current buildings?

No. Our current buildings will remain fully functional until December 2026, with all facilities and student services operating as normal. There will be no reduction in teaching quality, resources or student support during this period.

Will students’ timetables change when they move to the new building?

No. The timetable students receive in September will stay the same for the whole academic year. There will be no changes to days, lesson times or teachers as a result of the move.

How will students be supported when they move into the new building?

In January 2027, all students will take part in a formal induction to the new building. This will ensure they are fully oriented, know where to go and feel comfortable using the new facilities from day one.

What happens to the current college buildings after the move?

From January 2027, the current main college building will begin to be demolished. Careful planning will be in place to limit disruption during this period, and ensure a safe environment for students and staff.

Will there be changes to parking on campus?

Yes, but for the better. Once demolition is complete, the site of the current main building will become the new college car park, which is planned to open in summer 2027.

Will the Christmas break be different during the transition year?

Yes. To support a smooth move, there will be a three-week Christmas break in December 2026. This allows:

  • Students a clear break
  • Our staff a dedicated week to move equipment and set up classrooms so that teaching can start smoothly in the new building in January 2027.
Will this transition affect students’ learning or experience?

No. The transition has been carefully planned to ensure:

– Continuity of teaching
– No disruption to timetables
– A smooth, well-supported move into a brand-new, modern learning environment
– Students will benefit from continuity at the start of the year and a fresh start in a state-of-the-art building after Christmas.

How will students/parents be kept informed throughout?

We’ll provide regular updates through college communications such as our student and parents newsletters, including key dates, reminders, and what to expect at each stage.

Is the current car park closed?

Due to construction work our car park is unavailable, except for blue badge holders.

There are designated on-street parking spaces away from the college, for example on Stray Rein or at West Park multi-storey car park which is a short walk from the college. Hornbeam Business Park’s spaces cannot be used.

Related News stories

Harrogate College students being given a tour of our under-construction new campus by developers Caddick Construction

Training the tradespeople of tomorrow

Read more

A group of Rossett School students visiting Harrogate College's under-construction new campus

School visit to our new campus shines a light on the construction industry

Read more

Staff and students wearing helmets and high vis smiling at the steel signing ceremony

Harrogate College celebrates milestone as new campus takes shape

Read more